- Details
- Category: Projects and Contracts
Nexra, Cadeler’s offshore wind service platform, and Vattenfall Vindkraft AB have signed a memorandum of understanding (MoU) to explore the development of operations and maintenance (O&M) solutions for the offshore wind industry.
- Details
- Category: Projects and Contracts
Mammoet has completed an electric-powered transport of a monopile during the onshore marshalling of components for the Baltica 2 offshore wind farm in Denmark. The pilot was carried out with Van Oord, Ørsted and PGE at the Port of Rønne. Mammoet and Van Oord had agreed to test electric transport of a monopile under real project conditions, using Baltica 2 as the test project.
- Details
- Category: Projects and Contracts
Power Sustainable Energy Infrastructure has sold the Golden South Wind Energy Project to Concord Green Energy, the renewable energy division of Concord Pacific Group. Located near Assiniboia, Saskatchewan, Golden South is the province's largest operating wind project. The 200 MW facility entered commercial operation in March 2022 and supplies renewable electricity to Saskatchewan's grid.
- Details
- Category: Projects and Contracts
European Energy has reached commercial operation at the 27 MW Tsoukes Sarres wind park in Greece, completing its first wind project in the country. Located in the Municipal Unit of Avlida across the regions of Voiotia and Evia, Tsoukes Sarres consists of six onshore wind turbines with a total installed capacity of 27 MW.
- Details
- Category: Projects and Contracts
BGB Group has been awarded a framework agreement for offshore scaffolding and construction services for the Baltica 2 offshore wind farm. Baltica 2 is a 1.5 GW offshore wind farm located approximately 40 km off the Polish coast near Ustka and Łeba. The project is expected to be fully commissioned by the end of 2027.
- Details
- Category: Projects and Contracts
Inch Cape Offshore Wind Farm has completed the installation of its second 85-kilometre offshore export cable off the east coast of Scotland. The second of two 220 kV three-phase export cables was installed in three 28-kilometre sections by Enshore Subsea using the cable-laying vessel CMOS Installer, operating from the Port of Blyth. Two offshore joints were completed by specialists aboard Normand Cutter. The cable was buried in the seabed using the ENS1100 hybrid trenching vehicle, with some final rock placement still to be completed.
- Goldwind to supply turbines for 408 MW Gawara Baya wind project
- PNE and Enercon develop Beerfelde energy park
- SeaTwirl signs MoU for 20 MW floating wind project in Australia
- Vestas announces orders in Germany, Sweden and North America
- Navaris secures 304.5 MW in latest onshore wind auction
- Huisman to deliver cranes for Cadeler’s T-class vessels
- European Energy wins support for 89.6 MW in German wind tender
- Eiffage joint venture wins second 2 GW offshore converter platform contract
- Ørsted tenders for bird and bat monitoring in Polish Baltic Sea
- Revolution Wind completes turbine installation off Rhode Island
- Inauguration of He Dreiht offshore wind farm
- Oracle invests in 1.7 GW of wind generation in Texas
- Masdar and Taaleri Energia inaugurate 154 MW Čibuk 2 wind farm
- Masdar signs agreements on German offshore wind and battery storage
- Construction starts on TeneT’s second 2 GW jacket
- Vineyard Wind and GE Vernova resolve commercial litigation
- Prokon selects OneView for 918 MW wind fleet
- Vestas announces three orders totalling 119 MW
- ABO Energy agrees to sell Argentine renewable energy portfolio
- Nordex receives 91 MW order in Brandenburg
- GE Vernova to supply turbines for 29.4 MW Japanese wind farm
- Morecambe offshore windfarm receives consent for transmission assets
- VOS secures long-term ERRV contract for East Anglia wind farms
- EIB provides financing for Princess Elisabeth Energy Island
- Štip wind farm reaches financial close in North Macedonia
- Nordex to supply 34 MW for repowering project in Hesse
- Gennaker offshore wind farm reaches financial close
- Ørsted receives final opinion regarding taxation of Walney Extension and Hornsea 1
- DRI refinances 60 MW wind project in Romania
- Suzlon secures 200 MW wind order from Ayana Renewable Power




