![The certificate was delivered to Seon Mook LIM, Executive Vice President of HHI, by Christophe Capitant, Chief Country Executive of BV Korea, at a ceremony hosted by HHI Offshore & Industrial Division in Ulsan, Republic of Korea HHI receives an Approval in Principle for Hi Float Floating Offshore Wind Turbine Foundation](/images/stories/News/News2021/HHI_receives_an_Approval_in_Principle_for_Hi-Float_Floating_Offshore_Wind_Turbine_Foundation.jpg)
The offshore floating wind substructure “Hi-Float” is designed to support a 10MW wind turbine using semi-submersible and mooring technology. A passive ballast system ensures that risk is kept to a minimum during offshore operations. The good performance of Hi-Float in offshore environment was verified through numerical analysis and wave basin model testing.