Nordex Group has received a 42 MW order from Navaris for the Lambacher Höh wind farm in Rhineland-Palatinate, Germany. The order covers the supply and installation of four N163/6.X turbines and two N175/6.X turbines, as well as a 20-year service contract.
The wind farm is being built southwest of Bitburg, close to the Luxembourg border. The turbines will be installed on hybrid towers, with the four N163/6.X turbines having a hub height of 164 metres and the two N175/6.X turbines a hub height of 179 metres.
Installation of the first turbine is scheduled for January 2028, with full commissioning planned for July 2028.
Navaris is Qualitas Energy's German renewable energy platform and has operated under the Navaris name since September 2026.




