IQIP has signed a rental agreement with Cadeler for the use of the Hydrohammer IQ6, fitted with the Pulse add-on. The equipment will be used for installing 64 monopiles at the East Anglia Two offshore wind farm.
East Anglia Two is developed and owned by ScottishPower Renewables. The project is scheduled to begin in March 2027 in the southern North Sea, off the east coast of England. It will comprise 64 turbines rated at 15 MW each.




