European Energy has inaugurated its first hybrid park in Kronoberg county, Sweden, combining wind and solar generation. The facility includes a 49.6 MW wind farm with eight turbines and a 39.3 MWp solar park.
Annual production is expected to reach around 126 GWh. The park feeds into the Swedish electricity grid through a single connection point. Skåramåla is the first of three solar-wind hybrid parks planned by European Energy in Sweden, with the Grevekulla project in Ydre Municipality already under construction.