Follow us at  twitter
Siemens Gamesa’s newest direct drive offshore wind turbine, the SG 14-222 DD, has a capacity of 14MW, reaching up to 15MW using the company’s Power Boost function.
 
The 222-meter diameter rotor uses the new Siemens Gamesa B108 blades. Each 108-meter long IntegralBlade is cast in one piece using patented Siemens Gamesa blade technologies. Additionally, the turbine has a swept area of 39,000 m2. It allows the SG 14-222 DD to provide an increase of more than 25% in Annual Energy Production compared to the SG 11.0-200 DD offshore wind turbine. The nacelle has a weight of 500 metric tons. The prototype is expected to be ready in 2021 and the new turbine will commercially be available in 2024.
Joomla SEF URLs by Artio

Related Articles