Latest Issue
 
Windtech International May June 2025 issue
 

Login

 

FOLLOW US AT

follow

 Follow us at BlueSkyFollow us at BlueSky

 

follow


Ocergy has officially launched the Reduced Commercial Risks with Demo of 15+ MW (RECORD15) Joint Industry Project, which aims to install a next-generation wind turbine with rated capacity above 15 MW on an OCG-Wind floating platform by 2028.

A front-end engineering and design (FEED) contract has been signed with three international offshore wind developers: EnBW, Kyuden Mirai Energy, and Tepco Renewable Power. The OCG-Wind platform is a modular, turbine-agnostic design built from pre-fabricated steel sub-assemblies. It enables streamlined assembly and supports serial production using existing infrastructure and supply chains. The tower will feature a stiff-stiff configuration to address technical challenges associated with deploying large turbines on floating foundations.

 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.