
The LM 107.0 P will now proceed with post-molding finishing touches, before undergoing testing and validation to demonstrate its ability to withstand more than 20 years of operation offshore. The 107-meter blade is set to capture the wind for GE’s Haliade-X 12 MW offshore wind turbine.