Follow us at  twitter
Jan De Nul Group will mobilise its jack-up installation vessel Taillevent for the installation of all 32 wind turbines for the Trianel Wind Farm Borkum II (TWB2)  in the German North Sea. The start-up of installation is foreseen mid-July 2019.
Joomla SEF URLs by Artio

Related Articles