Follow us at  twitter
Gamesa has finished the construction of the Bii Nee Stipa II wind farm in the Mexican state of Oaxaca, developed and constructed by Enel Green Power. The wind farm is outfitted with 37 G80-2.0MW wind turbines.
Joomla SEF URLs by Artio