Latest Issue
 
Windtech International March April 2024 issue

 

FOLLOW US AT

follow

 

follow


ABB has secured an order from Yantai CIMC Raffles Offshore, China, to deliver an integrated bridge-to-propeller technology for Havfram Wind’s two new NG20000X-HF Wind Turbine Installation Vessels (WTIVs).
 
The vessels incorporate the latest battery-hybrid drivetrain technology and have the capability of installing offshore wind turbines with a rotor diameter of more than 300 meters, as well as XXL monopiles weighing up to 3,000 tons at water depths of up to 70 meters. ABB scope comprises four Azipod electric main propulsion units with a total propulsion power of 17 MW; the Onboard DC Grid power distribution system; a 4.1MWh energy storage installation; ABB Ability Marine Pilot Control with Dynamic Positioning System for advanced vessel control.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.