Search
- 41. TPI Composites agrees with GE to expand capacity in Mexico
- (Company News)
- ... 2% decrease in the number of wind blades produced due to lower customer demand and delivery delays from increased inspection and repair activities, a decrease in other wind related sales for mold decommissioning ...
- Created on 04 August 2023
- 42. BlueFloat Energy select Global Maritime event simulation software
- (Product News)
- BlueFloat Energy has selected Global Maritime’s OPSIM software in order to simulate construction, operation and decommissioning activities for their offshore wind projects. BlueFloat Energy has ...
- Created on 28 July 2023
- 43. Germany awards 7 GW of offshore wind in its latest auction
- (Industry News)
- ... for 20 years from commissioning of the sites. For each of the four sites more than one company pledged to build without any state support, triggering an additional “dynamic bidding procedure”. ...
- Created on 14 July 2023
- 44. Bernhard Schulte Offshore orders two CSOVs from Ulstein
- (Projects and Contracts)
- Bernhard Schulte Offshore and Ulstein Verft have signed a contract for the design and construction of two Commissioning Service Operation Vessels (CSOVs) of the Ulstein SX222 design. The contract ...
- Created on 10 July 2023
- 45. Vestas wins orders in Spain and the USA
- (Projects and Contracts)
- ... featuring 4 MW platform wind turbines to power an undisclosed wind farm in the USA. The order includes supply, delivery, and commissioning of the turbines, as well as a 20-year service agreement, designed ...
- Created on 03 July 2023
- 46. Vestas announces onshore wind orders in Greece, Italy, Spain and Japan
- (Projects and Contracts)
- ... as well as a service agreement. Turbine delivery is planned for the third quarter of 2024, while commissioning is scheduled for the fourth quarter of the same year. Italy-based engineering and ...
- Created on 30 June 2023
- 47. Vestas wins order in Italy with a 35-year service agreement
- (Projects and Contracts)
- OX2 has placed a 27 MW order for the Eolia wind park, to be located in the Apulia Region, Italy. The contract includes the supply and installation of six V150-4.5 MW wind turbines, as well as ...
- Created on 28 June 2023
- 48. Envision Energy receives 350MW order in India
- (Projects and Contracts)
- Envision Energy has received a 350MW order for a wind energy project from Serentica Renewables in India. The wind farm will be built in Maharashtra and is scheduled for commissioning by December ...
- Created on 20 June 2023
- 49. RWE selects Atlantique Offshore Energy to supply substations for Nordseecluster
- (Projects and Contracts)
- Atlantique Offshore Energy has been selected by RWE as preferred supplier to execute Engineering, Procurement, Construction, Installation and Commissioning of the Electrical Offshore Substations required ...
- Created on 20 June 2023
- 50. Vestas secures repowering order from Vitol in the USA
- (Projects and Contracts)
- ... site’s current Senvion MM92-2.05 MW wind turbines. The order includes supply, delivery, and commissioning of the turbines, as well as a 20-year service agreement. Turbine delivery begins in the ...
- Created on 16 June 2023
- 51. PGE and Ørsted have selected suppliers of offshore substations for Baltica 2
- (Projects and Contracts)
- PGE Group and Ørsted have signed an agreement with a consortium of Semco Maritime and PTSC Mechanical & Construction for the design, manufacturing and commissioning of offshore power stations for the Baltica ...
- Created on 14 June 2023
- 52. Vestas wins 221 MW order in Scotland
- (Projects and Contracts)
- ... MW wind turbines and includes supply, delivery, and commissioning of the turbines. Upon completion, Vestas will service the turbines under a 30-year service agreement. Turbine delivery will begin in the ...
- Created on 09 June 2023
- 53. GE Grid Solution to supply gas-insulated substations for hydrogen plant in Saudi Arabia
- (Projects and Contracts)
- ... responsible for the design, manufacturing, supply, and supervision of the installation and commissioning of the 92 bays of GIS for the plant. The equipment is being manufactured at Grid Solutions’ site ...
- Created on 08 June 2023
- 54. Vestas wins order in Turkey
- (Projects and Contracts)
- Vestas has received a 37 MW order for a wind project in Turkey. The contract includes the supply and installation of six V162-6.2 MW wind turbines, as well as a 10-year service agreement. Turbine ...
- Created on 25 May 2023
- 55. Vestas secures 72MW order in Argentina
- (Projects and Contracts)
- Vestas has received an order for a project in Argentina that includes supply of 16 V150-4.5 MW turbines as well as a 30-year service agreement. Deliveries and commissioning are planned for 2024. ...
- Created on 24 May 2023
- 56. Vard secures contract for two CSOVs for Purus Wind
- (Projects and Contracts)
- Vard has announced that they have signed a contract for the design and construction of two Commissioning Service Operation Vessels (CSOVs) for UK based Purus Wind. The agreement also has an option ...
- Created on 22 May 2023
- 57. Suzlon secures a new order of 99 MW from Vibrant Energy
- (Projects and Contracts)
- Suzlon Group has announced that it has received an order from Vibrant Energy for 33 wind turbine generators (WTGs) featuring its new 3 MW series with a Hybrid Lattice Tubular (HLT) tower for a 99MW wind ...
- Created on 18 May 2023
- 58. Eolus plans to develop onshore wind power in Finland with a capacity of more than 600MW
- (Projects and Contracts)
- Eolus has signed a cooperation agreement with Finnish landowner Finsilva for the development of five wind power projects with a potential for more than 600 MW in total. The projects are in an ...
- Created on 15 May 2023
- 59. Seatrium secures two offshore substation platform projects from Empire Wind
- (Projects and Contracts)
- ... Offshore Wind, a joint venture between Equinor and bp. The scope of the project involves the engineering, procurement, construction, offshore hook-up and commissioning of two Offshore Substation ...
- Created on 05 May 2023
- 60. Ørsted approves interim report for the first quarter of 2023
- (Company News)
- ... this year with commissioning by the end of 2025. Its 100 MW Salamander project, a joint venture between Simply Blue Group, Subsea 7, and Ørsted, won a Scottish floating wind lease during the quarter. The ...
- Created on 03 May 2023