Follow us at  twitter
Located near Eneabba in mid-west Western Australia, the Warradarge Wind Farm project will feature 51 V136-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode with hub heights of 84 meters.
 
The order is placed by Bright Energy Investments, a joint venture between Western Australian electricity generator and retailer Synergy, global infrastructure investment fund DIF and Australian industry superannuation fund Cbus. Upon completion, Vestas will commence an up to 30-year service agreement designed to maximise energy production for the lifetime of the project. Commercial operations at Warradarge Wind Farm are scheduled to commence in the third quarter of 2020.
Joomla SEF URLs by Artio