Latest Issue
 
Windtech International March April 2024 issue

 

FOLLOW US AT

follow

 

follow


For the first time, a REpower type 5M wind turbine has been set up on the open sea.

ImageIn the Scottish North Sea, in the Moray Firth, the first of a total of two turbines for the "Beatrice" demonstrator wind farm has just been set up on a lattice-like jacket structure, piled to the seabed at a depth of 44 metres. Prior to the installation, a floating crane barge carried the turbine with more than 900 tonnes on its hooks, 25 kilometres on the open sea from the port of Nigg. It is there that the two 5M wind turbines are shortly to be linked to the grid connection of the "Beatrice Alpha" oil rig and then commissioned.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.