NACEL Energy Corporation has confirmed it has entered into four long term wind development rights agreements covering 1025 acres in Donley County, Texas, USA.

Leila Lakes is the Company's fifth Texas wind energy project. At project build-out, NACEL Energy anticipates 20MW, or more, of power generation from Leila Lakes. Leila Lakes is located within electrical proximity to NACEL Energy's 10MW Hedley Pointe wind energy project affording additional flexibility with respect to interconnection and turbine siting. Collection of site specific wind data will begin soon with the installation of a 60 meter (200 ft.) NRG Systems meteorological tower transmitting data back to NACEL Energy, via an Iridium satellite uplink. While wind data is collected, additional development steps including without limitation, interconnection engineering, turbine engineering and obtaining turbine debt financing, must be completed by the company.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.