Follow us at  twitter
Scada network and wireless telecommunications supplier, EMR Integrated Solutions has announced it has completed a communications infrastructure upgrade at 15 onshore wind farms for Enerco Energy.
 
Stretching from Cork in the south to Mayo in the west, the upgrade provides a communications network allowing Enerco’s energy trading desk to have ‘always on’ access to wind farm data and meet its regulatory reporting requirements to grid operator, EirGrid. The EMR team performed a discovery exercise at each wind farm and issued a set of network design recommendations, based on telecoms availability at each site.  Fully redundant satellite backup links with automatic failover were deployed, mitigating the risk of network downtime. A multi-layered information security solution was also configured, protecting the integrity of sensitive trading data as it traverses the internet.
Joomla SEF URLs by Artio

Related Articles

  • Massachusetts Offshore RFI area to be cut by half
    The US Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) is cutting the potential area available for future commercial wind energy leasing on the Outer Continental Shelf (OCS) off ...Windtech International - Windtech International is the worldwide information magazine for the wind energy industry. It provides the ideal forum for the promotion and explanation of new products, techniques and applications. This trusted and well-respected source of information is read regularly by an increasing readership