Latest Issue
 
Windtech International May June 2024 issue

 

FOLLOW US AT

follow

 

follow


DONG Energy has chosen SmartWind Technologies for the supply of a dual-Doppler radar system for offshore wind measurement.

The two radars are to be installed in 2016 on the coast near the Westermost Rough Offshore Wind Farm. They will produce high-resolution dynamic maps of the wind flow through and around the wind farm. The measurement campaign will last 18months focusing on wind farm wakes, power curve measurements and wind turbine load validation. The campaign is part of the BEACon research and development project, and the project team will be responsible for running the test and demonstration of the new radars. With the wind data from the BEACon project DONG Energy will be able to refine the assumptions and models used in optimising wind farm layouts and in the design of turbine foundations.

 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.