Latest Issue
 
Windtech International March April 2024 issue

 

FOLLOW US AT

follow

 

follow


Gamesa has unveiled its new wind turbines, the G106-2.5 MW and G114-2.5 MW.

The new turbines, designed for high and medium wind speed sites, come with a longer blade (106m and 114m, respectively) and a higher nominal capacity of 2.5 MW. the G106-2.5 MW and G114-2.5 MW produce 30% more power than the G90-2.0 MW and G97-2.0 MW models, while lowering the cost of energy by 10%. The company also unveiled Gamesa WindNet PRO, an enhanced version of its production-optimising wind farm control and monitoring software. This tool upgrades Gamesa’s existing SCADA system WindNet. It comes in three different configurations depending on the size of the wind farm: Gamesa WindNet PRO Advanced (facilities with more than 25 turbines), Gamesa WindNet PRO Light (between 5 and 25) and Gamesa WindNet PRO Ultralight (less than 5). This software is capable of processing the wind farms' operational data for transformation into readily-accessible and valuable information by generating reports and tracking trends in key performance indicators.

 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.