Follow us at  twitter
WP Hoort 2wpd windmanager is assuming the operational management for a wind farm of Loscon. From now on, the operations manager will take care of the commercial management of the Hoort wind farm in the Ludwigslust/Parchim district, south of Schwerin, Germany.
 
The wind farm operated by Loscon went into operation in 2020 and consists of 10 Nordex N117 3600 turbines with a total output of 36 MW.
Joomla SEF URLs by Artio