Follow us at  twitter
The first LTW42 turbine, manufactured by Leitwind, has been installed in Steinfeld, in Schleswig-Holstein, Germany. The installation is a collaboration between the Leitner group and E.ON. By the end of 2020 a further 49 LTW42 wind turbines will be installed by the partners.
 
The 250kW turbine uses the Leitwind DirectDrive technology and has a tower height of 28 metres which allows a simplified authorisation process and an installation closer to buildings compared to conventional wind turbine generators. The turbine is compatible to grids of low-voltage at 400V and can be directly connected to the distribution unit of the customer so the customer can self-consume the major part of the produced energy without being dependent on intermediary distributors and without being exposed to the varying feed in tariffs of the energy market.
Joomla SEF URLs by Artio