Follow us at  twitter

Keystone Engineering Inc. has been awarded the contract to design the meteorological mast tower foundation for US Wind Inc's Maryland offshore wind lease area.

The foundation's "braced-caisson" design is often used in the oil and gas industry. The US Wind met mast will be the first structure installed as part of its planned commercial-scale wind farm capable of generating 500MW of power in the 80,000 acre area 15 miles off the coast of Maryland.

Joomla SEF URLs by Artio

Related Articles