Follow us at  twitter
Lindahl Figure 1Joining Up Observation and Simulation of Wind Farms
 
When assessing the monthly performance of wind farms post-construction, uncertainty in assumed wake losses contributes a substantial proportion of uncertainty in the production assessment. The operational data analysis software of Lindahl now integrates the cloud-based wake model, WakeBlaster, providing a simple interface for simulating wake climate over the project operating history of a wind farm.
 
By Staffan Lindahl and Dr Wolfgang Schlez, UK

Want to read full articles? Sign up free of charge and login and read the full text of published articles on our website.

Joomla SEF URLs by Artio