The ten thousandth Enercon wind turbine is connected to the grid.
It is located on a mountain ridge just above the small village of Kisselbach in the Hunsrück region (German state of Rhineland-Palatinate). The Enercon E-82/2MW with a 108 metre hub height was bought by JUWI GmbH in Mainz. JUWI, which is in charge of this project, will also be looking after the commercial and technical management once installation has been completed. The actual owner is an international investment group.