The 2 MW Floatgen floating wind turbine, equipped with Ideol’s floating foundation and installed on the Sem-Rev test site (Atlantic Coast of France), exceeded production and availability expectations in the second half of 2019.
 
During the second half of 2019, the floating wind turbine has more than doubled its power production in comparison with the first semester, to reach an annual total of 6 GWh. This number was achieved because of a time availability exceeding 94.6% in the second semester. The wind turbine faced maximum wave heights of up to 12.5 meters (= significant waves of up to 6.5 meters) and remained fully operational throughout these first winter months, producing power up to 5.5 meters of significant wave height and up to 24.2 m/s of wind speed.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.