The first prototype blade for Vestas’ new V117-3.3 MW turbine has been manufactured at Vestas’ factory in Brighton, Colorado, USA.
 
Vestas converted the factory into a modular and flexible production line capable of producing blades for both the V112 and V117 turbines. The 57.5-metre prototype blade is the first of a new variation of the 55-metre blade used for the V112-3.0 MW- with a 2.5-metre root extension. The 57.5-metre blade is on route to Vestas’ testing facilities on the Isle of Wight, UK- for validation and lifecycle testing. The factory in Colorado also recently manufactured the blades for the V117-3.3 MW prototype due to be assembled in July in Denmark, as well as the blades for the first five V117-3.3 MW turbines which have been sold to a customer in Denmark.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.