SSE Renewables and HiDef complete offshore aerial survey programme for offshore wind farmsSSE Renewables and Hi Def Aerial Surveying have recently completed a 24-month aerial survey programme as part of the proposed Berwick Bank and Marr Bank offshore wind farms. The survey consisted of 300 hours of flight time, across 5,000 square km. The survey, undertaken by HiDef Aerial Surveying, involved 4 aircraft flying simultaneously, once a month, for 24 months.
 
Each aircraft is equipped with high definition camera equipment that captures live footage and is then assessed by ornithology and marine experts. So far, the team have analyzed over 15 million images following the survey and successfully documented the habits of over 338,000 birds and over 2000 marine mammals. The proposed Berwick Bank and Marr Bank wind farms would be located in the outer Firth of Forth, over 49km and 40km, respectively, from the East Lothian coast. The Berwick Bank project is expected to be 2.3GW and comprise of up to 242 offshore wind turbines. Marr Bank is projected to be 1.85GW.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.