Print
Published: 19 January 2021 19 January 2021
Ming Yang installs first MySE8.3 180 hybrid drive offshore wind turbineMing Yang’s MySE8.3-180 hybrid drive offshore wind turbine had its debut at the Xinghua Bay Offshore wind farm Ⅱ in China.
 
Unveiled in November 2019, the MySE8.3-180 turbine features 86.5-metre blades and has a sweeping area of 24900 m2.
Joomla SEF URLs by Artio