Royal Boskalis Westminster (Boskalis) has signed an exclusive Pre-Construction Agreement (PCA) for the Inch Cape offshore wind farm project. The award was made by Inch Cape Offshore Limited (ICOL), a subsidiary of Red Rock Power. The award of the contract is subject to a successful bid by ICOL in the next UK Contracts for Difference auction (mid 2019) and financial close (second half of 2020).
 
The contract size, excluding procurement, is expected to exceed € 200 million. Boskalis will in the coming months assist with the further engineering and design of the project. The ultimate size of the contract including the cost associated with the supply of the wind turbine foundations and inter-array cables will be determined during this period. The PCA includes the engineering, supply, transportation and installation of up to 72 pre-piled jacket foundations and up to 84 inter-array cables in addition to the transportation and installation of the offshore substation. The Bokalift 1 crane vessel will be deployed for the transportation and installation of the foundations as well as the offshore substation foundation, sub-structure and topside. Furthermore, Boskalis will in consortium with NKT supply and install two export cables of 85 kilometer each, connecting the offshore substation to the mainland. The Inch Cape offshore wind farm will be located in the North Sea, 15 kilometres off the Angus Coast in the East of Scotland. The project is scheduled to be executed in the period 2021-2022, in time to enable Inch Cape to meet the CfD 3 delivery windows between 2023 to 2025.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.