ABO Wind has managed the construction of a 126 megavolt ampere (MVA) substation in Välikangas, Finland, on behalf of Luxcara. The Välikangas transformer station ensures that the electricity produced by 24 Vestas V150 wind turbines, each with an output of 4.3MW, is fed into the grid.
 
The substation is located in the municipality of Haapajärvi, in the centre of Finland. Four transformers each with a capacity of 25/31.5 MVA, have been supplied and installed by Hitachi ABB Powergrids. They convert the voltage of the energy produced in the wind farm from 33 kilovolts to 110 kilovolts before the electricity is fed into the grid of the operator Elenia.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.