GE Renewable Energy has announced it has signed an onshore wind contract with EDF Renewables in Brazil. GE will be responsible for the production and delivery of 25 turbines, that will operate at 5.3MW. The new GE machines will be installed at the Ventos da Bahia wind farm, located near the cities of Bonito and Mulungu do Morro, 350 KM from Salvador.
 
Unit heights will range between 101 and 126 meters, with 77-meter carbon blades and a 158-meter rotor. After installation, these turbines will bring an additional 132.5 MW capacity to EDF Renewables’ Ventos da Bahia wind farm, which today has an installed capacity of 182 MW. The deal also includes 20 years of operation and maintenance (O&M) services for all the equipment supplied by GE in the facility. The units will be produced at GE’s facility in Camaçari (BA). Blades will be produced by LM Wind Power, a GE Renewable Energy’s business unit located in the Port of Suape (PE).
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.