News
Editorial Features
Subscription Services
Magazine Profile
Advertising
Events
Previous Issues
Jobs
Newsletters
WWEA Page
 

Get the latest news by RSS news feed

 

Register here to receive our newsletter and to access old issues






Lost Password?
No account yet? Register

As registered user you are also able to submit news to us through this site


CWEE2010
Final results of trial program with NPPD Print E-mail
Tuesday, 26 January 2010
Catch the Wind Ltd. has released the final results of its trial program with Nebraska Public Power District (NPPD). The results demonstrated that Catch the Wind’s Vindicator Laser Wind Sensor (LWS) increased the energy output of a turbine by an average of 12.3 pe rcent as a result of better alignment with oncoming wind and increased gust detection.

The increased energy output was achieved while the Vindicator LWS controlled the turbine for only 56 pe rcent of the time as specified by the parameters of the 30-day trial. Excluding statistically insufficient measurement data, the Vindicator LWS improved energy output by more than 18 per cent. A technical report, which details the results of the field trial, and an economic valuation model, in which the financial return of the Vindicator LWS is calculated, can be found at www.catchthewindinc.com.
 
< Prev   Next >
 
© Windtech International 2004-2010