News
Editorial Features
Subscription Services
Magazine Profile
Advertising
Events
Previous Issues
Jobs
Newsletters
 

Get the latest news by RSS news feed

 

Register here to receive our newsletter and to access old issues






Lost Password?
No account yet? Register

As registered user you are also able to submit news to us through this site


Metocean Design for Sheringham Shoal Offshore Wind Farm Print E-mail
Tuesday, 27 March 2007
Metoc plc has completed a Metocean Design for Scira Offshore Energy for the proposed 'Round 2' Sheringham Shoal offshore wind farm in the southern North Sea off the North Norfolk coast.

The study assesses metocean criteria for engineering design, fatigue analysis, and installation planning of wind turbine structures, other associated offshore structures, and seabed cabling. The wind farm is to consist of some 45 to 108 wind turbines, within a site of 14 square. miles, (35 square. km). The turbines rated power will be between approximately 3.0 and 7.0MW, with an estimated maximum power capacity of 315MW. The minimum distance to shore from the nearest turbine will be around 9.0 nautical miles and the turbines are to be supported by foundations secured to the sea bed.
 
< Prev   Next >
 
© Windtech International 2004-2009