To help meet the US needs, eight small businesses will develop wind technology as a cost-effective, reliable, and compatible distributed energy resource under the 2021 round of the U.S. Department of Energy’s (DOE’s) Competitiveness Improvement Project (CIP).
The 2021 CIP selectees are expected to share about $2.2 million in DOE funding and leverage about $1.3 million of industry cost share. They are:
 
  • Accelerate Wind Inc. (St. Louis, Missouri) will develop a modular 5-kilowatt (kW) horizontal axis wind turbine with integrated solar, which is designed to be deployed on the edges of commercial buildings. The project will take the concept from a preliminary design stage to a test-ready, preproduction prototype.
  • Bergey Windpower (Norman, Oklahoma) will implement several design and manufacturing changes to the Excel 15 wind turbine generator, lowering its cost by 26% and leading to an 8% reduction in total wind turbine manufacturing cost.
  • Intergrid LLC (Temple, New Hampshire) will develop and implement improved simulation and testing capabilities to allow faster and lower-cost certification of upgrades to the Intergrid IG-25, a 25-kW programmable inverter.
  • Pecos Wind Power (Somerville, Massachusetts) will develop the first full-scale prototype of an 85-kW wind turbine designed for low-wind-speed sites. Pecos will also install this turbine at the Renewable Concepts factory in Neodesha, Kansas, for initial prototype testing and evaluation.
  • Siva Powers America Inc. (Ransomville, New York) will develop new, lighter-weight 14.4-meter blades for its existing 250-kW turbine. This will extend the rotor diameter to 35 meters and boost energy production, reduce electricity costs, and increase access to lower wind-speed sites.
  • Sonsight Wind (Grayson, Georgia) will test a new 3.5-kW wind turbine prototype designed for residential, small commercial-scale, and remote hybrid energy system applications.
  • Windurance LLC (Coraopolis, Pennsylvania) will design, test, and obtain third-party certification of a programmable control system for wind turbines. The controller operates the turbine’s mechanical and electrical systems and is designed for 85-kW to over 150-kW wind turbine models.
  • Xflow Energy Company (Seattle, Washington) will conduct prototype testing of a 25-kW vertical axis wind turbine designed for isolated microgrids and remote communities. The project builds on previous CIP and DOE Small Business Innovation Research awards and will bring this new, low-cost turbine closer to commercial viability.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.