Wärtsilä receives order for Taiwanese offshore wind farm installation vesselWärtsilä’ has been selected to deliver a scope of the company’ solutions for a wind farm main installation vessel (MIV). The ship is to be built at the CSBC shipyard in Taiwan for the joint-venture company CDWE (CSBC-DEME Wind Engineering) owned by CSBC and Belgium-based DEME Group.
 
The full scope includes four Wärtsilä 46DF and two Wärtsilä 20DF dual-fuel engines, as well as Transverse and Steerable Thrusters, DP-3 solution, Navigation system, and selective catalytic reduction (SCR) systems for emissions abatement. The company will also provide site supervision services. The Wärtsilä equipment is scheduled to be delivered during 2021 and the ship is expected to begin operations in the Taiwan Straits in 2023.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.