Van Oord / Cablel has selected First Subsea to supply cable protection systems (CPS) for the export cables and cross over protection for TenneT’s Net op zee Hollandse Kust (zuid) offshore wind farm located 20 kilometers off the coast of The Hague in the Netherlands.
 
First Subsea will engineer, test and supply a CPS for the protection of the 220 kV export cables and the 66 kV interlink cable between the J-tube at the offshore sub-stations, Alpha and Beta. The platforms shall be of a jacket design and J-tubes used to guide and protect the export cables entering the platforms. The export cables are protected by the CPS, which is  installed on top of the scour protection and trenched beyond the scour protection. The scope of work also includes crossing protection for four submarine power cables which will each cross three pipelines. A total of twelve pipeline crossings shall be supplied and installed by Van Oord / Cablel. The crossing designs consist of a CPS, which will be designed and supplied by First Subsea.
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.