motion compensated gangway Barge Master Bosch RexrothBarge Master and Bosch Rexroth have jointly introduced a new motion compensated gangway to the offshore wind market. The first actually manufactured gangway is currently being tested onshore at the Bosch Rexroth facilities in Boxtel, the Netherlands. In the near future the gangway will be installed on the offshore support vessel VOS Start of fleet operator Vroon.

The gangway will be mounted on a pedestal which holds an integrated elevator, used to transport both people and pallet trolleys from ship deck and levels below, to the level of the gangway. The gangway consists of telescopic sections, so the length of the gangway can be adjusted to the situation offshore. This telescoping is performed by an hydraulic winch system. The gangway is equipped with fast sensors and control technology. Movements of the ship can be translated into ‘counter movements’ of the gangway within milli­seconds. Because of this, the system is able to compensate for wave heights up to 3 meters (Hs).

Live demonstation of the  motion compensated gangway

Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.