News
Editorial Features
Subscription Services
Magazine Profile
Advertising
Events
Previous Issues
Jobs
Newsletters
 

Get the latest news by RSS news feed

 

Register here to receive our newsletter and to access old issues






Lost Password?
No account yet? Register

As registered user you are also able to submit news to us through this site


CWEE2009
Wind Energy Condition-Based Monitoring Print E-mail
Wednesday, 09 March 2005
Case Study and Cost–Benefit Analysis on Implementation of CBM
The focus of this case study and cost–benefit analysis is an application of a condition-based monitoring (CBM) tool installed in a 700kW wind turbine generator at a project based in the USA. The installation was in response to reports that several wind farms had experienced catastrophic gearbox failures, resulting in exorbitant costs and lost revenues. It began in summer 2003 with a cooperative pilot study, the objective being implementation of a ‘trial installation’ that would demonstrate the benefits of a CBM system on a wind turbine to help prevent catastrophic failures.

By Staff Writer, Prasentia, and  Roland Kewitsch, Product Manager, Schenck-Trebel, USA
 
< Prev   Next >
 
     © Windtech International 2004-2008