News
Editorial Features
Subscription Services
Magazine Profile
Advertising
Events
Previous Issues
Jobs
Newsletters
 

Get the latest news by RSS news feed

 

Register here to receive our newsletter and to access old issues






Lost Password?
No account yet? Register

As registered user you are also able to submit news to us through this site


CWEE2009
Motorola successfully completes wind and solar power trial Print E-mail
Wednesday, 06 December 2006

Motorola has announced that it has successfully completed a trial to demonstrate the feasibility of alternative power systems that can support remote GSM Base Stations (BTS).

The trial concluded that a combination of solar cells and wind turbines can generate 1,200 watts in a continual cycle; enough to drive a mid-sized BTS and support a microwave backhaul installation. Powering BTS sites in both developed and emerging markets is a challenge for operators because of the high cost or difficulty of provisioning mains electrical power. Motorola's green-powered BTS, part of the company's Reach GSM portfolio, can replace or reduce the load on mains power and can also remove the need for power generators that require continual re-fueling and security. In collaboration with Bristol, Bath and Surrey Universities, Motorola successfully ran the year-long test at its GSM facility in Swindon, UK. During the trials, Motorola used a combination of solar and wind power to run a GSM base station and charge batteries that kick in when the solar or wind power is insufficient. Motorola's alternative power solutions are now available to trial in live networks across the EMEA and Asia Pacific regions.

 
< Prev   Next >
 
     © Windtech International 2004-2008