News
Editorial Features
Subscription Services
Magazine Profile
Advertising
Events
Previous Issues
Jobs
Newsletters
 

Get the latest news by RSS news feed

 

Register here to receive our newsletter and to access old issues






Lost Password?
No account yet? Register

As registered user you are also able to submit news to us through this site


DEWEK 2008
REpower 5M: Successful offshore premiere Print E-mail
Thursday, 24 August 2006
For the first time, a REpower type 5M wind turbine has been set up on the open sea.

ImageIn the Scottish North Sea, in the Moray Firth, the first of a total of two turbines for the "Beatrice" demonstrator wind farm has just been set up on a lattice-like jacket structure, piled to the seabed at a depth of 44 metres. Prior to the installation, a floating crane barge carried the turbine with more than 900 tonnes on its hooks, 25 kilometres on the open sea from the port of Nigg. It is there that the two 5M wind turbines are shortly to be linked to the grid connection of the "Beatrice Alpha" oil rig and then commissioned.
 
< Prev   Next >
 
     © Windtech International 2004-2008