News
Editorial Features
Subscription Services
Magazine Profile
Advertising
Events
Previous Issues
Jobs
Newsletters
 

Get the latest news by RSS news feed

 

Register here to receive our newsletter and to access old issues






Lost Password?
No account yet? Register

As registered user you are also able to submit news to us through this site


EWEC2009
GH wins contract for UK offshore engineering design project Print E-mail
Tuesday, 19 August 2008
Garrad Hassan (GH) has been contracted by EDF Energy to undertake the Front End Engineering Development (FEED) study for a Teesside Offshore Wind Farm off the coast of North East England.

The FEED study is a key stage in the development of such a project, addressing areas of technical uncertainty in all aspects of the project. Included in the scope of the study for Teesside are economic optimisation, planning sequencing of work and determining the best contracting strategy. Garrad Hassan will be responsible for all areas of the study: project management, wind turbine, layout design and analysis, offshore structures, electrical system and grid connection, O&M, marine installation, cable installation, H&S, risk management and procurement support. Garrad Hassan will be supported in this project by BOMEL Limited.
 
< Prev   Next >
 
     © Windtech International 2004-2008